Gator
The Most Unknown Member
Lifetime Member
I'm laying a 3/4" carbon steel plate. It was set about 3" above the operating floor. We left several 3" holes in the plate and poured Escoweld Epoxy grout into the holes.
Now I'm trying to weld disc's into the holes. The welds are cracking. I've tried everything I know.
Has anyone had this happen to them?
I think the epoxy is outgassing.
I've tried MIG, TIG and Stick
Now I'm trying to weld disc's into the holes. The welds are cracking. I've tried everything I know.
Has anyone had this happen to them?
I think the epoxy is outgassing.
I've tried MIG, TIG and Stick