L
LarryAmboy
Well-Known Member
Seems to me that your Aluma dealer (salesmen) is/are misinformed. The Aluma deck is aluminum. I have never heard of welding steel (e-track) to aluminum. If there is aluminum e-track available, it wouldn’t have the strength for tying down a side by side. Bolting the e-track down would work well. Just be careful in your positioning. There are a few places on the bottom of the deck that you can’t get to. Your pioneer has different width tires front and rear and if you just use 2” wide straps, you’ll need to get the straps in the center of the tire. Centers of front tires should be 54” and centers of rear tires 52”. The stock machine is 63” wide. The safest setup would be using the Mac tire baskets then set your E-track centers at 53” front & rear. With this setup, if you decide to change tire widths or rim widths at a later date, the tire basket setup will still work well
You can weld steel to aluminum thru the use of a bimetallic transition bar, not practical for this application, but could be done.
Sent from my iPad using Tapatalk