Had some time this past Saturday to get my double bow rack built...
Had some scrap metal laying around..
Started by installing the correct size clamp mounts to the top of the roll bar and on on the rear grab handle.. Used some metal spacer so the rack does not contact my mid panel and attached some square tubing to the mounts.. ( gunna use bolts where the slotted head is, did not want to run to the store)
Had some scrap metal laying around..
Started by installing the correct size clamp mounts to the top of the roll bar and on on the rear grab handle.. Used some metal spacer so the rack does not contact my mid panel and attached some square tubing to the mounts.. ( gunna use bolts where the slotted head is, did not want to run to the store)