Kitchen is getting close. Gotta get most of the cabinets in before the water lines on that side. Using any available space for storage and have quite a bit so far. My wife has had a lot of input to make sure everything is as good as possible for use. Keeping access to absolutely everything as well as any part of the original van box best we can. Also keeping access to mount awning at a later date.
It’s been tough we’ve been recycling everything from the donar camper. Some things there hasn’t been a choice on and paneling has proven to be a b****, spent 6 hours just pulling staples and grinding glue of the back side.
The structure is all 2x2 screwed and glued with 1x2 used as paneling stop along floors and such. All paneling is glued and stapled. It’s very solid. Some readjusting and trim is still needed in the area and it will receive an insulated ceiling later hence some unfinished look up top.
View attachment 80311
Yes I know some cabinet door grains are facing wrong way, unfortunately there was only so much to choose from. I will correct that later with leftover paneling. It bugs the s*** out of me but need to keep going. So far about 35 sq ft storage, we can get a little more.